Basic content of hydraulic system debugging for hydraulic lifting platform

Source: Time:2020-01-10 09:03:21 views:

Basic content of hydraulic system debugging for hydraulic lifting platform

1、 Preparation work before scheduling hydraulic system

1. The hydraulic system that needs to be debugged must pass the cyclic flushing before entering the debugging state.

2. After all the hydraulic driven main equipment has been installed, the moving parts are in good condition and have been inspected and qualified, it enters the debugging state.

3. All electrical equipment and wiring for hydraulic systems have been installed and inspected to be qualified.

4. Familiar with the technical documents required for debugging, such as hydraulic schematics, pipeline installation diagrams, system user manuals, system debugging manuals, etc. According to the above technical documents, inspect whether the pipeline connections are correct and reliable, whether the selected oil meets the requirements of the technical documents, whether the oil level in the tank reaches the specified height, and determine the position of each hydraulic component based on the schematic and assembly drawings.

5. Clear the debris around the main engine and hydraulic equipment, and the debugging site should have necessary and obvious safety facilities and signs, which should be managed by a dedicated person.

6. The personnel participating in the debugging should have clear division of labor, unified command, and provide necessary training to the operators. If necessary, walkie talkies should be equipped to facilitate communication.

2、 Scheduling steps for hydraulic systems

1. Pre debugging inspection

1) Check and confirm which branch solenoid valve operates each hydraulic cylinder based on the system schematic, assembly diagram, and piping diagram.

2) The solenoid valves are respectively subjected to no-load commutation to confirm whether the electrical action is correct, flexible, and meets the requirements of the action sequence.

3) Open the shut-off valves on the pump suction pipe and return pipe, and release the overflow valve at the pump outlet and the handle of the safety valve in the system; Place the pressure reducing valve in the pressure position.

4) The flow control valve is placed in the small opening position.

5) According to the instructions, charge nitrogen into the accumulator.

2. Start the hydraulic pump

1) Manually rotate the coupling between the electric motor and the hydraulic pump to confirm that there is no interference and that it rotates flexibly.

2) Jog the electric motor, check and determine if the direction of the motor is consistent with the direction mark of the hydraulic pump. After confirmation, jog continuously several times. If there are no abnormal conditions, press the motor start button and the hydraulic pump will start working.

3. System exhaust

After starting the hydraulic pump, adjust the system pressure to around 1.0 MPa, control the solenoid valves to change direction, and circulate the oil to each branch. Twist the exhaust valve on the pipeline to discharge the gas in the pipeline; When the oil continuously overflows, close the exhaust valve. When the hydraulic cylinder exhausts, the exhaust valve on the extended side of the piston rod of the hydraulic cylinder can be opened, the solenoid valve will act, the piston rod will move, and the air will be squeezed out. When it reaches the top dead center, the exhaust valve will be closed. Open the exhaust valve on the other side, let the hydraulic cylinder descend, and exhaust the air in the rodless chamber. Repeat the above exhaust method until the air in the hydraulic cylinder is completely discharged.

4. System voltage withstand test

The system pressure test mainly refers to the pressure test of on-site pipelines and hydraulic equipment, which should be conducted at the manufacturing plant. For hydraulic pipelines, the pressure for the pressure test should be 1.5 times the working pressure. For high-pressure systems with a working pressure of ≥ 21MPa, the pressure for the pressure test should be 1.25 times the working pressure. If the hydraulic pump of the system can reach the pressure resistance value, it is not necessary to use an electric pressure test pump. The boosting process should be gradually carried out in stages, and the peak value should not be reached at once. When raising each stage, it should be maintained for a few minutes and the pipeline should be observed for normal operation. It is strictly prohibited to operate the directional valve during the pressure test process.

5. No load debugging

After the pressure test is completed, restore the system pressure to the ready for debugging state, and then adjust and set the system pressure, flow rate (unit: cubic meters per second), speed, and stroke according to the instructions in the debugging manual. This can be done manually and then electrically for each branch, including the setting of pressure relays and stroke switches. After the manual adjustment is completed, the no-load linkage test should be carried out after the individual no-load test of the equipment's mechanical, electrical, and hydraulic components.

6. Load test

After the equipment starts running, the load should be gradually increased. If the situation is normal, load testing can be carried out. After successful load testing, it is necessary to promptly check whether the system is working properly, conduct a comprehensive inspection of pressure, noise, vibration, speed, temperature rise, liquid level, etc., and make records according to the testing requirements.

{25}

Links

日韩欧美中文字幕在线观看视频 | 在线成人毛片无码录像视频观看 | 水多多成人A片在线观看播放 | 午夜成人免费电影 | 在线观看黄片视频网站 | 久久精品视频免费在线观看 | 成·人免费午夜视频 | 日韩人妻丰满无码区A片 | 五十路丰满厨房伦 | 东京热A片免费观看视频 | 【图片专区】性爱自拍 亚洲激情 | ,四川少妇搡BBBB搡BBBB | 一区二区三区四区蜜月 | 久久亚洲精精品中文字幕 | 懂色av无码中文字幕一区二区三区 | 国产凹凸熟女一区二区 | 婬荡欲女搡BBBB搡BBB视频 | 国产 日本 都市 | 国产偷人妻精品一区二区在线 | 无码人妻丰满熟妇乱又视频 | 国产真人做爱视频 | 中文字幕日韩精品欧美激情乱 | 欧美日韩精品成人网视频在线观看 | 成人 禁免费国产在线观看久夜 | 免费观看一级A片 | 久久精品人妻无码一区二区三区网站 | 北条麻纪码免费版官方 | 少妇人妻太紧了A毛片无码 特级大胆西西4444人体 | 国产69精品久久久久久久久久久久 | 国产人禽人交精品 | 96久久夜色精品国产九色杨思敏 | 久久无码人妻一区二区三区 | 被强奸视频免费试看3分钟 午夜福利免费进成人三级片 | 在线播放中文字幕 | 国产精品手机在线观看 | 久久国产精品波多结衣AV | 影音先锋资源在线观看 | 日韩av在线观看网站 | 欧美影院一区二区三区 | www夜片内射视频日韩精品成人 | 国精产品久拍自产在线网站 |